- Public Comment Period Ends November 30
Red Line Extension Project
Draft Environmental Impact Statement and Section 4(f) Evaluation
CTA and Federal Transit Administration (FTA) are proposing to extend the Red Line 5.3 miles from 95th Street to 130th Street. Click here to learn more about the project.
CTA and FTA have prepared a Draft Environmental Impact Statement (EIS) based on the technical analysis of impacts of the proposed project. The Draft EIS documents the benefits and impacts of the alternatives being considered, which include impacts to parks and wetlands. Click here to review the Draft EIS on the RLE Project website. Hard copies of the Draft EIS also are available for review through November 30, 2016. Click here to learn more about reviewing the Draft EIS.
Comments on the Draft EIS are being accepted until November 30, 2016 at 4:30 PM. You may submit comments via e-mail to RedExtension@transitchicago.com or by mail to Chicago Transit Authority, Strategic Planning, 10th Floor, Attn: Red Line Extension Project, 567 W. Lake Street, Chicago, IL 60661.
Do you require assistance?
If you have questions or need assistance, contact Gerald Nichols, CTA Government and Community Relations at 312-681-2710 or GNichols @ transitchicago.com.
Para más informacion en Español, llame al 312-681-2710
Customer Information: 1-888-YOUR-CTA (1-888-968-7282)
Thank you for your continued interest.
RLE Project Team
Chicago Transit Authority
Past Elections
Current Temperature
Showing posts with label feedback. Show all posts
Showing posts with label feedback. Show all posts
Monday, November 28, 2016
CTA Red Line Extension Public Comment Period Ending
An e-mail from the Chicago Transit Authority
Subscribe to:
Posts (Atom)